Resources & Forms

Construction Standards

Technical Bulletin – FMF-FC 2023

Technical Bulletin – FMF-FC 2023-02

Technical Bulletin – FMF-FC 2023-01

Technical Bulletin – FMF-FC 2022-02

Technical Bulletin – FMF-FC 2022-01

New Construction & New Additions Form

This form captures the specific construction details for new construction and new additions to existing buildings. Qualifications for additions are listed in section 3.1.1.2.3 of the FORTIFIED Multifamily–Wind Standard.

This form is to be filled out by the project architect, a licensed structural engineer, and the general contractor and/or roofer. It confirms the requirements for the selected FORTIFIED level have been included in the building documents and the contractor and/or roofer is aware of these requirements.

Fill out only the applicable sections. For example, if a low-sloped roof is the only type of roof on the project, do not fill out the steep-slope section—mark the section as not applicable (N/A). Additionally, some portions pertain to only Hurricane or High Wind—fill out accordingly depending on your building’s exposure.

New Construction & Additions Form

Existing Construction – Re-Roofing

These compliance forms for existing construction and existing additions covers all the relevant aspects of the program in one document for low-slope roofs and one for steep-slope roofs.

These forms are to be filled out by the project architect, a licensed structural engineer, and the general contractor and/or roofer. It confirms the requirements for the selected FORTIFIED level have been included in the building documents and the contractor and/or roofer is aware of these requirements.

Low-Slope

Steep-Slope

Hail Supplement

This form captures the (optional) supplemental hail hazard requirements outlined in the FORTIFIED Multifamily–Wind standard. To achieve a hail designation or compliance, the building must be located in a hail‐prone county as shown in Figure 1 and all hail requirements [marked “(Optional) Hail Supplement”] throughout the standard must be met in addition to either the hurricane or high wind requirements.

This form is to be submitted in addition to either the (1) New Construction & New Additions Form, (2) Existing Construction Re‐Roofing Form, or (3) a combination of the two.

This form is to be filled out by the project architect, a licensed structural engineer, and the general contractor and/or roofer. It confirms the requirements for the hail supplemental have been included in the building documents and the contractor and/or roofer is aware of these requirements.

Hail Supplement

Stay In The Know

Do you want to keep up with the latest resiliency research? Would you like timely tips and reminders to keep your home safe from Mother Nature? Are you interested in the science behind the FORTIFIED standard? Then, sign up for customized emails to learn more.

What Can We Help You With?

Give us a little more information and we’ll be happy to assist! In the meantime, have you checked out our FAQs?

Thank you for your inquiry! Someone will follow up with you in 24-48 hours!